• 电话:0538-7271096 中文  |  EN
The processing of conveyor belt running deviation method

    The first: adjust the carrying idler group.

    Second: self-aligning roller installation group.

    Third: zhang JinChu adjustment belt zhang JinChu belt conveyor was running a very important link in the process of partial adjustment.

    Fourth: adjust the driving drum and redirection roller position and driving drum and the adjustment of the redirection roller is an important part of the belt running deviation adjustment.

    Fifth: two-way adjustment of deviation of belt conveyor running operation.